Basement Remodeling/Renovation with a Wet Bar - Milford MA
Basement Remodel with a Wet Bar and Laundry: This project features the Waypoint Living Model Truffle 460F Door for the wet bar, providing a cohesive and stylish look. The countertops are adorned with Granite Fantasy Brown, complete with a 4” backsplash and a standard edge profile, adding a touch of elegance to the space. For the sink and faucet, we selected the Delta Essa Pull-Down Bar/Prep Faucet that includes a Magnetic Docking Spray Head for ease of use, paired with a Kraus 20-3/4" Single Basin 16 Gauge Stainless Steel Kitchen Sink designed specifically for Undermount installation.
Flooring and Stairs: We installed Luxury Vinyl Tile (LVT) by MSI Surfaces, specifically the Prescott Boswell style, complemented by durable flooring reducers for a seamless transition. The stairs were elegantly carpeted with the soft and stylish Translate 5E328 505 Fossil, featuring a high-quality 4003 synthetic pad underneath for added comfort and support.
Door and Windows: We installed a variety of doors and windows that offer style and functionality. The doors include the LEGACY 420-2PAN SMTHST measuring 32 inches by 75 inches, along with the LEGACY FIRE SNGLENTDR, which is slightly larger at 36 inches by 78 inches and finished in a sleek snow white. For windows, we present the ECOLITE 441-HPPR, which has dimensions of 31.375 inches by 12.5 inches, and the ENDURE DH-2, a more spacious option at 48 inches by 42 inches, ensuring a great fit for various renovation needs.
Brief Overview of the Project: Rebuilt the staircase with a landing and added a closet underneath. Removed the old entrance door, broke up the concrete, and poured a new pad to improve drainage. Replaced the old window with a larger Provia double-hung window, added a hopper window, and installed a new garage door with self-closing hinges. Finished with a new Provia top glass entrance door.
Electrical: Installed a new sub-panel, ran circuits to meet code, set up washer/dryer connections, added up to 15 LED ceiling lights, and GFI outlets for the wet bar. Wired for an electric baseboard heater, utility lights, and a smoke/CO detector.
Plumbing: Completed plumbing for a wet bar sink, reconfigured washer connections, and updated the upstairs shower drain to code.
Insulation and Finishes: Insulated exterior walls and covered them with plasterboard for a smooth finish, ready for paint.
Doors and Trim: Installed interior doors and fixed shelving, matching existing trim and base moulding. Added a solid handrail on the stairs.
Painting and Flooring: Applied two coats of latex paint in a chosen color for the walls, with semi-gloss white for doors and trim. Installed luxury vinyl plank flooring (about 580 sq. ft.) and carpeted the stairs with mid-grade Berber carpet.