Whole House Renovation – Marlborough, MA (Completed by Core Remodeling Services in a Previous Project)

This comprehensive whole house renovation in Marlborough, MA, involved a major transformation, with approximately three-quarters of the walls taken down to the studs. The electrical, plumbing, and insulation were all updated to meet current building codes, ensuring improved efficiency, safety, and long-term reliability for the homeowners.

Exterior Upgrades

A brand-new exterior deck was constructed, featuring Trex decking and durable composite railings, providing a low-maintenance and long-lasting outdoor space for the homeowners to enjoy.

Bathroom Renovations

All three bathrooms were fully updated with a combination of modern and functional fixtures, including:

  • Sterling Ensemble Tub/Showers for a sleek, contemporary look.

  • Delta faucets and fixtures for reliable performance and water efficiency.

  • Miseno vanities, adding both style and practical storage.

  • Kohler bathroom accessories to complement the updated design.

  • Duraceramic 16” x 16” groutable vinyl tile flooring, delivering the classic look of tile with added durability and comfort.

Kitchen Transformation

The kitchen was completely renovated to blend style, durability, and functionality. Key upgrades include:

  • Norcraft Concord cabinetry in a striking Oak Charcoal finish, featuring soft-close doors and drawers for a premium touch.

  • Cambria Quartz countertops, providing a durable, non-porous surface with timeless beauty.

  • Timberline Lumberjack Hickory laminate click flooring, extending throughout the house, including the bedrooms and living room, to create a seamless and cohesive aesthetic.

This whole house remodel not only modernized the home's structure and interior but also significantly enhanced its comfort, energy efficiency, and aesthetic appeal.
 

kitchen  after 

kitchen after

KITCHEN before rot repair

kitchen before

Toilet before

bathroom before

bathroom 3 after

new shower in bathroom 3 

bathroom 2 after

bathroom 1 after